| Design study, then known as 'Bombardier
Model 70', revealed at the Paris Air Show in June 1997;
initially named Continental; first flight 14 August 2001.
Renamed Challenger 300 on 8 September 2002. Customer deliveries scheduled to begin in late
2002, with up to five aircraft expected to be handed over to
operators by the end of the year. Target production up to 15
in 2003, rising to 40 in 2004 and the maximum planned rate
of 60 per year from 2005.
 | A three-view drawing (950 x 545) |
zhuma, 20.06.2011 14:18 rising to 40 in 2004 and the maximum planned rate of 60 per year from 2005. reply |
chaiwat kosatanakom, e-mail, 21.10.2009 04:21 This website is very helpful! reply |
Do you have any comments?
|
|  COMPANY PROFILE All the World's Rotorcraft
|
20
reply